Santa Clara - Lehigh Southwest Reclamation Plan Amendment for Permanente Quarry State Mine ID # 91-43-0004, May 28, 2010. For your convenience Tables, Exhibits, Drawings, Maps, Photo and Attachments have been extracted from each document and listed below. These are usually much smaller files than the originals thus taking less time to load.
Entire Lehigh Application for Reclamation Plan Amendment Document [189 Mbytes]
Document |
Description |
Mbyes |
Pages |
Existing Quarry Area |
|
3 |
|
Quarry Production 2000-2009 |
|
12 |
|
Quarry Water Use (Purchased) |
|
15 |
|
Quarry Electrical Use (kW-hr/yr) |
|
16 |
|
Project Area - Existing and Planned Components |
|
21 |
|
Quarry Production by Project Phase (units: short tons, or tons) |
|
27 |
|
Sedimentation Basins |
|
33 |
|
1-Regional Location Map, 2-Project Location, 3-Permanente Quarry Project, 4-Site Description, 5-Mining Process, 6-Quarry Conveyor Circuit, 7-Rock Plant Facilities, 8-Project Area Activities |
20.5 |
35-42 |
|
Addendum Pictures of Structures to be Removed (1.8 Mbytes) |
1.8 |
69-70 |
|
Woodland Impacts |
0.8 |
72 |
|
Visual Stimulations (photos of quarry visibility from various locations in Cupertino |
66 |
74-95 |
|
Site Plans |
116 |
123-147 |
|
Bridge Scheme |
4.5 |
148-150 |
|
Assessor's Parcel Maps |
0.5 |
164-167 |
Reclamation Plan document [214 Mbytes]
Document |
Description |
Mbyes |
Pages |
1-Reginald Location Map, 2-USGS Vicinity Map, 3-Quarry Location, 4- Quarry Parcels, 5-Reclamation Plan Boundaries, 6-RPA Area |
|
2-7 |
|
1-General Plan, 2-Zoning, 3-Surrounding Land Uses |
|
10-12 |
|
1-Quarry Components, 2-Mining Process, 3-Quarry Conveyor Circuit |
|
31-33 |
|
Mining and Reclamation 1-Existing, 2-Phase 1, 3-Phase 2, 4-Phase 3, 5-Phase 4, 6-Phase 6, 7-Final |
|
35-41 |
|
1-Rock Plant Facilities |
|
48 |
|
1-Reclamation Phase Overview, 2-WMSA Reclamation Phases, 3-CMSA Reclamation Phases, 4-South Quarry Reclamation Phase, 5-North Quarry Reclamation Phase, 6-Topsoil Storage Area Reclamation, 7-Office/Crusher Area, Surge Pile, Rock Plant, 8-Ultimate Reclaimed Conditions |
|
62-69 |
|
Revegitation Plan Figures: Fig.1-Proposed Project Area, Fig.2-Visibility and Solar Radiation Analysis, Fig.3-Soil Sample Locations, Fig.4-Proposed Revegetation Plan, Fig.5-Test Plot Location Map, Fig.6-Yeager Yard Test Plot Layout, Fig.7-EMSA Test Plot Layout |
|
207-214 |
|
Biological Communities |
|
17 |
|
Quarry Components |
|
27 |
|
Phasing Progression |
|
34 |
|
Sedimentation Basins |
|
52 |
|
Qualitative Descriptions for Soil Surface Status |
|
53 |
|
Remedial Measures for Erosion Control |
|
54 |
|
Phasing Timetable |
|
69 |
|
Erosion Control Seed Mix |
|
80 |
|
Preliminary Species for General Hydroseeding |
|
81 |
|
Priliminary Trees and Shrub Plantings |
|
83 |
|
Riparian Revegitation |
|
84 |
|
Five-Year Performance Standards for Revegetation |
|
88 |
|
Legal Description |
0.4 |
|
|
Revegetation Plan |
6.3 |
|
|
Geotech Report |
104 |
|
|
EMSA CMSA Geotech Report |
8.8 |
|
|
Biological Resources Assessment |
20 |
|
|
Hydrologic Investigation |
21 |
|
|
Drainage Report |
11 |
|
|
Water Quality Analysis |
30 |
|
|
Noise Report |
1.5 |
|
|
Air Quality Analysis |
4.4 |
|
|
Archaeology |
0.5 |
|
|
1985 Reclamation Plan |
49 |
|
|
Permanente Quarry RPA fo EMSA June 2009 |
93 |
|